What Happens If My Plans Change?

Plans change — it is normal. Every report includes two revisions at no extra charge.

Design evolves between the first energy model and the final permit set. A window gets bigger, the client changes the heat pump, plan check asks for something. None of that should cost you a new report.

What a revision covers

  • Changes to window or door sizes, quantities or specifications
  • Different HVAC or water heating equipment
  • Insulation or assembly changes
  • Moderate changes in conditioned floor area
  • Responding to plan-check comments on the energy documentation

What counts as a new project

If the building is fundamentally redesigned — a different footprint, a change from an addition to new construction, or a different building type altogether — that is new work rather than a revision, and we will tell you honestly rather than quietly re-running it as a revision and then invoicing.

Plan-check corrections

If your building department returns a correction relating to the energy documentation we prepared, send it to us. Addressing it is what the included revisions are for. Send the correction letter itself rather than a summary — the specific code section the plan checker cites tells us exactly what they want.

Additional revisions beyond the two included are $49 each. There is no time limit trick here: send changes when they happen.

Frequently Asked Questions