Accessory dwelling units are the single most common Title 24 project in California, and they are also the one most often documented incorrectly. The reason is that an ADU is not one thing under the Energy Code. Depending on how it is built, the same 700 sq ft unit can be treated as a newly constructed building, an addition, an alteration, or space created entirely within an existing conditioned envelope — and each of those carries different requirements.
Title 24 compliance for an ADU in California
Title 24 compliance for a California ADU means showing, before the permit is issued, that the unit meets the 2025 Energy Code for what it is in energy terms: a new building, an addition or an alteration. The Energy Code has no ADU category of its own, so the way the unit is built decides the rules. The design is documented on a CF1R certificate of compliance at plan check. During construction the installers complete CF2Rs, an ECC-Rater tests any measures the CF1R lists for verification, and the building inspector signs the work off at final; what happens after you receive your report walks through those stages.
The 2025 Energy Code applies to every ADU whose permit application is submitted on or after 1 January 2026. Size, setbacks and height are state ADU law rather than Title 24, covered in California ADU rules and Title 24.
How your ADU is classified
Detached new construction — a standalone unit built from scratch. It is a new single-family building and meets the new-construction requirements in full, including newly installed solar PV unless an exception applies.
Attached addition — conditioned floor area added to the existing house, sharing a wall, floor or ceiling with it. It follows the addition rules and solar PV is not required.
Garage or basement conversion — unconditioned space brought into conditioned use, attached or detached. The code treats it as an addition, so solar PV is not required, and walls that keep their existing siding can use an exception to the continuous insulation requirement.
Junior ADU within the house — a JADU of up to 500 sq ft carved out of the existing home. That is an alteration, judged on what the work changes; any part taken from an attached garage is an addition.
Getting the classification wrong is the most common cause of an ADU energy correction at plan check, because an alteration, an addition and new construction trigger different requirements. Do ADUs need Title 24? walks through each case.
Two rules apply whichever type you build. A system serving the ADU needs its own thermostat, and the Mechanical Code does not allow return air from one dwelling unit to be discharged into another, so an attached ADU generally cannot share the main house's ducted system. And a vented range hood in an ADU has its certification, airflow and sone (noise) rating verified by an ECC-Rater.
Solar on detached ADUs
Newly constructed detached ADUs must have newly installed solar PV to meet the prescriptive requirements, unless an exception applies. Whether an exception applies to your project depends on the specifics, and it is one of the first things we check. If solar is not viable on your site, the performance compliance path may still get you there — we will tell you which route your project needs.
What you receive
A permit-ready CF1R Certificate of Compliance for your scope, registered where your project requires it, delivered by email as a PDF. Revisions are unlimited until your project complies, because ADU plans almost always move between the first model and the final permit set.
Common ADU Title 24 questions
- Do ADUs need Title 24 in California?
- What plans are needed for an ADU Title 24 report?
- How much does an ADU Title 24 report cost?
- How long does an ADU Title 24 report take?
- Does a garage conversion ADU need Title 24?
- Does a JADU need a Title 24 report?
- Does an ADU need solar under Title 24?
- What is the CF1R for an ADU?
- Does an ADU need HERS registration?
- What if plan check returns Title 24 corrections on an ADU?
- What are the California ADU rules for Title 24?
- Does a Prefab ADU Need Title 24?
- Do Pre-Approved ADU Plans Come With Title 24?
- New Detached ADU Title 24 Checklist
- Attached ADU Title 24 Checklist
- Garage Conversion ADU Title 24 Checklist
- Junior ADU (JADU) Title 24 Checklist
- ADU Addition vs New Construction: Which Title 24 Rules Apply?
- ADU Alteration vs Addition: Which Title 24 Rules Apply?
- ADU Over a Garage: Floor Insulation and Title 24
- Two-Story ADU Title 24 Requirements
- ADU Attached to a Garage: How Title 24 Classifies the Project
- Prefab and Factory-Built ADU Title 24 Requirements
- ADU Solar Exceptions and Exemptions Under the 2025 Energy Code
- Can New ADU Solar Panels Be Added to the Main House System?
- Can Existing Solar Panels Count for a New ADU?
- ADU Battery-Ready Requirements Under the 2025 Energy Code
- ADU Heat Pump Requirements in California for 2026 Permits
- Can an ADU Use a Mini-Split Heat Pump?
- Ducted vs Ductless Mini-Split for an ADU: Title 24 Differences
- ADU Heat Pump Water Heater Requirements
- Can a New ADU Use a Gas Water Heater?
- Can a New ADU Use a Gas Furnace?
- ADU Electric-Ready Requirements for Gas Appliances
- ADU Refrigerant Charge Verification: When Is It Required?
- ADU Duct Leakage Testing: When Is It Required?
- ADU Airflow Verification: When Is It Required?
- ADU Whole-House Ventilation Requirements
- ADU Kitchen Range Hood ECC Verification
- ADU Bathroom Exhaust Fan Requirements
- ADU MERV 13 Filter Requirements
- ADU Window U-Factor Requirements
- ADU Window SHGC Requirements
- ADU Skylight Requirements Under Title 24
- ADU Wall Insulation Requirements
- ADU Attic and Roof Insulation Requirements
- ADU Slab Edge and Floor Insulation Requirements
- ADU Cool Roof Requirements by Climate Zone
- Remodeling the House and Adding an ADU: How Many Title 24 Reports Do You Need?
Frequently Asked Questions
Almost always, because an ADU either creates new conditioned space or alters regulated components. Your building department makes the final determination for your project.
Showing on a CF1R at plan check that the unit meets the 2025 Energy Code for how it is built: a new detached ADU as a new building, an attached ADU or garage conversion as an addition, and a JADU inside the house as an alteration. Installers, an ECC-Rater where required and the building inspector then confirm it during construction.
Yes. Converting an unconditioned garage into an ADU is treated as an addition rather than new construction, so the solar requirement does not apply. Converting space that was already conditioned is an alteration.
Newly constructed detached ADUs prescriptively require solar PV unless an exception applies. Attached additions and conversions are treated differently. We confirm which applies to your project.
From $199, including up to 1,000 sq ft. Above that, each additional 100 sq ft is +$9, shown in the order form before you pay.