ADU Title 24 Energy Reports

Compliance documentation for detached ADUs, attached ADUs, garage conversions and JADUs — prepared for the 2025 Energy Code and priced from $199.

  1. Choose your report
  2. Upload your plans
  3. Pay securely
  4. Permit-ready report by email

Accessory dwelling units are the single most common Title 24 project in California, and they are also the one most often documented incorrectly. The reason is that an ADU is not one thing under the Energy Code. Depending on how it is built, the same 700 sq ft unit can be treated as a newly constructed building, an addition, an alteration, or space created entirely within an existing conditioned envelope — and each of those carries different requirements.

Title 24 compliance for an ADU in California

Title 24 compliance for a California ADU means showing, before the permit is issued, that the unit meets the 2025 Energy Code for what it is in energy terms: a new building, an addition or an alteration. The Energy Code has no ADU category of its own, so the way the unit is built decides the rules. The design is documented on a CF1R certificate of compliance at plan check. During construction the installers complete CF2Rs, an ECC-Rater tests any measures the CF1R lists for verification, and the building inspector signs the work off at final; what happens after you receive your report walks through those stages.

The 2025 Energy Code applies to every ADU whose permit application is submitted on or after 1 January 2026. Size, setbacks and height are state ADU law rather than Title 24, covered in California ADU rules and Title 24.

How your ADU is classified

  • Detached new construction — a standalone unit built from scratch. It is a new single-family building and meets the new-construction requirements in full, including newly installed solar PV unless an exception applies.

  • Attached addition — conditioned floor area added to the existing house, sharing a wall, floor or ceiling with it. It follows the addition rules and solar PV is not required.

  • Garage or basement conversion — unconditioned space brought into conditioned use, attached or detached. The code treats it as an addition, so solar PV is not required, and walls that keep their existing siding can use an exception to the continuous insulation requirement.

  • Junior ADU within the house — a JADU of up to 500 sq ft carved out of the existing home. That is an alteration, judged on what the work changes; any part taken from an attached garage is an addition.

Getting the classification wrong is the most common cause of an ADU energy correction at plan check, because an alteration, an addition and new construction trigger different requirements. Do ADUs need Title 24? walks through each case.

Two rules apply whichever type you build. A system serving the ADU needs its own thermostat, and the Mechanical Code does not allow return air from one dwelling unit to be discharged into another, so an attached ADU generally cannot share the main house's ducted system. And a vented range hood in an ADU has its certification, airflow and sone (noise) rating verified by an ECC-Rater.

Solar on detached ADUs

Newly constructed detached ADUs must have newly installed solar PV to meet the prescriptive requirements, unless an exception applies. Whether an exception applies to your project depends on the specifics, and it is one of the first things we check. If solar is not viable on your site, the performance compliance path may still get you there — we will tell you which route your project needs.

What you receive

A permit-ready CF1R Certificate of Compliance for your scope, registered where your project requires it, delivered by email as a PDF. Revisions are unlimited until your project complies, because ADU plans almost always move between the first model and the final permit set.

Common ADU Title 24 questions

  1. Do ADUs need Title 24 in California?
  2. What plans are needed for an ADU Title 24 report?
  3. How much does an ADU Title 24 report cost?
  4. How long does an ADU Title 24 report take?
  5. Does a garage conversion ADU need Title 24?
  6. Does a JADU need a Title 24 report?
  7. Does an ADU need solar under Title 24?
  8. What is the CF1R for an ADU?
  9. Does an ADU need HERS registration?
  10. What if plan check returns Title 24 corrections on an ADU?
  11. What are the California ADU rules for Title 24?
  12. Does a Prefab ADU Need Title 24?
  13. Do Pre-Approved ADU Plans Come With Title 24?
  14. New Detached ADU Title 24 Checklist
  15. Attached ADU Title 24 Checklist
  16. Garage Conversion ADU Title 24 Checklist
  17. Junior ADU (JADU) Title 24 Checklist
  18. ADU Addition vs New Construction: Which Title 24 Rules Apply?
  19. ADU Alteration vs Addition: Which Title 24 Rules Apply?
  20. ADU Over a Garage: Floor Insulation and Title 24
  21. Two-Story ADU Title 24 Requirements
  22. ADU Attached to a Garage: How Title 24 Classifies the Project
  23. Prefab and Factory-Built ADU Title 24 Requirements
  24. ADU Solar Exceptions and Exemptions Under the 2025 Energy Code
  25. Can New ADU Solar Panels Be Added to the Main House System?
  26. Can Existing Solar Panels Count for a New ADU?
  27. ADU Battery-Ready Requirements Under the 2025 Energy Code
  28. ADU Heat Pump Requirements in California for 2026 Permits
  29. Can an ADU Use a Mini-Split Heat Pump?
  30. Ducted vs Ductless Mini-Split for an ADU: Title 24 Differences
  31. ADU Heat Pump Water Heater Requirements
  32. Can a New ADU Use a Gas Water Heater?
  33. Can a New ADU Use a Gas Furnace?
  34. ADU Electric-Ready Requirements for Gas Appliances
  35. ADU Refrigerant Charge Verification: When Is It Required?
  36. ADU Duct Leakage Testing: When Is It Required?
  37. ADU Airflow Verification: When Is It Required?
  38. ADU Whole-House Ventilation Requirements
  39. ADU Kitchen Range Hood ECC Verification
  40. ADU Bathroom Exhaust Fan Requirements
  41. ADU MERV 13 Filter Requirements
  42. ADU Window U-Factor Requirements
  43. ADU Window SHGC Requirements
  44. ADU Skylight Requirements Under Title 24
  45. ADU Wall Insulation Requirements
  46. ADU Attic and Roof Insulation Requirements
  47. ADU Slab Edge and Floor Insulation Requirements
  48. ADU Cool Roof Requirements by Climate Zone
  49. Remodeling the House and Adding an ADU: How Many Title 24 Reports Do You Need?

Frequently Asked Questions

From $199 · ready in 2–3 days

Order Report