How Much Does a Title 24 Report Cost?

Pricing depends on building type, conditioned floor area, the number of dwelling units, and how quickly you need the report.

  1. Choose your report
  2. Upload your plans
  3. Pay securely
  4. Permit-ready report by email

There is no state-set fee for a Title 24 report. Every provider prices its own work, which is why quotes vary so widely. What legitimately moves the price is the amount of modelling involved: a larger building, more dwelling units, more complex mechanical systems and a tighter deadline all take more analyst time.

Title 24 certification cost

Title 24 certification costs the same as the Title 24 report, because the report is the certification: the certificate of compliance (the CF1R, LMCC or NRCC) that your building department approves at plan check. We do not charge for a certificate on top of the report. With us it starts at $199 for an ADU, $245 for a house and $345 for multi-family, commercial projects are quoted, and CHEERS registration is included where your project requires it.

Three things change our price: the size of the building above the area included in the starting price, the number of dwelling units above four on a multi-family project, and speed, since standard 2–3 business day delivery is included and a 24-hour rush is $95. The list below gives each step. The certificate itself is explained on Title 24 report and certification.

Title 24 report prices by project type

  • ADU — $199 for up to 1,000 sq ft, then $9 for each additional 100 sq ft
  • Residential — $245 for up to 3,500 sq ft, then $49 for each additional 500 sq ft
  • Multi-Family — $345 for up to 4 units and 4,000 sq ft, then $95 for each additional unit and $25 for each additional 500 sq ft
  • Commercial — quoted per project after we review your plans
  • 24-hour rush — $95 on ADU, residential and multi-family reports. If you need it faster, contact us before ordering.

How the price is worked out

Each report has a starting price that covers a set size, and the price rises in fixed steps above it. A 1,200 sq ft ADU is two 100 sq ft steps above the 1,000 sq ft base, so it is $199 plus two $9 steps. A 4,200 sq ft house is two 500 sq ft steps above 3,500, so it is $245 plus two $49 steps. An eight-unit building of 7,000 sq ft is four units and six area steps above the base. The pricing cards on the homepage add this up as you change the size, and the order form shows the same total before you pay.

What does not change the price

The climate zone, the compliance path and the type of work. A zone 16 project costs the same to document as a zone 6 one, a design that needs the performance path costs the same as one that passes the prescriptive checklist, and new construction, an addition and an alteration are priced the same way. Those things change the work behind the report, not the price. An addition is priced on the area being added, not on the finished size of the house.

Pricing in detail for each project type

What is included in the price

Every report includes the compliance documentation your building department expects, registration where the project requires it, and unlimited revisions until you comply. Revisions are never charged separately, however many rounds of plan-check comments it takes.

What the price does not include

Three costs on a Title 24 project belong to other people, whoever prepares your report:

  • ECC field verification and diagnostic testing. Where the certificate lists measures that need it, such as duct sealing or refrigerant charge, an independent ECC-Rater tests them on site during construction and records the results on CF3Rs. ECC-Raters were called HERS raters until 1 January 2026. The rater is booked and paid separately.
  • Installers' CF2Rs. Each contractor who installs a regulated feature completes the certificate of installation for their own work.
  • Permit and plan check fees. Your building department charges its own fees.

A quote that seems to include any of these deserves a question about who does that work. What happens after you receive your report shows where each one fits.

Why commercial is quoted, not listed

Nonresidential scope varies far too much for a fixed price to be honest. A lighting-only tenant improvement and a ground-up medical building are not comparable pieces of work. We review your plans, occupancy type and systems first, then send a fixed quote — with no payment required to get one.

If you have a written quote from another provider, send it to us. We will beat it.

Frequently Asked Questions

Explore Report Cost and Pricing

  1. What Else Do You Pay For Besides the Title 24 Report?
  2. Which Square Footage Counts for a Title 24 Report and Its Price?
  3. How Title 24 Decisions Shape a Construction Budget
  4. How Much Does a Residential Title 24 Report Cost?
  5. Are Title 24 Revisions Included? What Counts as a Revision and What Is a New Project

View all Report Cost and Pricing guides → · Reports and Calculations · Title 24 guide

From $199 · ready in 2–3 days

Order Report