Title 24 Revisions: All Answers
13 answers in Permits and Compliance.
- Choose your report
- Upload your plans
- Pay securely
- Permit-ready report by email
What to do when the plans or the installed equipment change after the report. Pick the question closest to yours.
- The Square Footage Changed After the CF1R: Do I Need a New Report?
- Changed the Roofing After the CF1R: What to Do
- Which Field Changes Need an Amended CF1R? A Quick Reference
- The Solar System Is a Different Size Than the CF1R: What to Do
- The House Was Mirrored or Rotated After the CF1R: Is the Report Still Valid?
- Title 24 for a Permit Revision After Plan Check
- Changed HVAC After the CF1R: What to Do
- Do Lighting Changes After the Report Need a Revised CF1R?
- Changed Windows After the CF1R: What to Do
- Changed the Insulation or Wall Framing After the CF1R: What to Do
- Changed Water Heater After the CF1R: What to Do
- What Happens If the Architect Changes the Plans After Title 24?
- What Happens If the Contractor Installs Different Equipment Than the CF1R?
Back to Permits and Compliance, or see the full Title 24 guide.
