How Long Does a Title 24 Report Take?

Our standard turnaround is 2–3 business days from the point we have everything we need, with a 24-hour rush when a deadline is tight.

  1. Choose your report
  2. Upload your plans
  3. Pay securely
  4. Permit-ready report by email

Most residential and ADU reports are straightforward once the plans are complete. The clock starts when we have a legible plan set and the project details — not when the order is placed, because a missing floor plan or an unreadable elevation stops the work.

Turnaround by project type

  • ADU, residential and multi-family — 2–3 business days as standard, or within 24 hours with a $95 rush
  • Commercial — 4–5 business days as standard, or 2–3 business days with a rush, confirmed with your quote
  • Faster than 24 hours — contact us before ordering and we will tell you honestly whether the date is achievable

What sets the pace for each type

  • ADU: having the complete drawings and the project address together. An order with missing sheets waits for them.
  • Residential: what is known about the existing house, such as wall insulation, existing windows and equipment. Size matters far less.
  • Multi-family: the number of distinct unit types, not the square footage. A unit matrix speeds it up most.
  • Commercial: a lighting schedule with input wattages and a settled mechanical scope.

What slows a project down

The most common delays are avoidable. Plans submitted without dimensions or a scale, window schedules that do not match the elevations, and missing mechanical information all require us to come back to you with questions. Projects where the scope changes mid-review also restart part of the analysis.

What we do when something is missing

We contact you directly rather than guessing. An assumption baked into an energy model is the kind of thing that produces a correction letter at plan check, which costs far more time than the phone call would have. If we spot a genuine problem in the plans — an undersized system, a fenestration ratio that will not comply — we tell you before we build the model.

Commercial projects are scheduled individually. We give you a delivery date with the quote rather than a generic estimate.

Frequently Asked Questions

Explore Report Turnaround

  1. 15 Title 24 Mistakes That Trigger Plan Check Corrections
  2. How Long Does a Residential Title 24 Report Take?
  3. Can You Get a Title 24 Report in 24 Hours? What a Rush Covers and What It Cannot Speed Up
  4. How Long Does a Revised Title 24 Report Take, and What Else Has to Follow?
  5. How Long Is a Title 24 Report Valid?

View all Report Turnaround guides → · Reports and Calculations · Title 24 guide

From $199 · ready in 2–3 days

Order Report