Do I Need a Title 24 Report for My Project?

In most California jurisdictions, a Title 24 energy compliance report is part of the plan-check submittal whenever a permit touches a regulated building system.

  1. Choose your report
  2. Upload your plans
  3. Pay securely
  4. Permit-ready report by email

Quick check: do you need a Title 24 report?

Does the work need a building permit?
What is the project?

Title 24, Part 6 is the California Energy Code. It applies statewide, and your local building department enforces it during plan check. The short answer is that if your project needs a building permit and it affects the building envelope, HVAC, water heating, lighting or the electrical systems the code regulates, a compliance report is normally required.

Projects that typically require a report

  • Newly constructed homes, ADUs and other dwelling units
  • Additions that add conditioned floor area
  • Alterations that replace or add regulated equipment — for example a new HVAC system, ducts, a water heater, or windows
  • Garage or basement conversions that create new conditioned space
  • Nonresidential tenant improvements affecting lighting, mechanical or envelope

Projects that often do not

Purely cosmetic work — flooring, paint, cabinetry, non-structural finishes — generally does not trigger the Energy Code, because it does not alter a regulated component. Repairs that return a component to its existing condition are treated differently from alterations.

The important caveat

Your building department has the final say. Some jurisdictions apply local ordinances that go beyond the state code, and a few ZIP codes span more than one climate zone, which the jurisdiction resolves. If you are unsure, the fastest route is to ask your plan checker what they require for your specific scope, or send us your plans and we will tell you honestly whether you need a report at all.

Permit applications submitted on or after 1 January 2026 are reviewed under the 2025 Energy Code. Which edition applies is determined by your permit application date, not by when construction starts.

Frequently Asked Questions

Explore Building Permit Questions

  1. Do I Need Title 24 for a Detached Office or Studio?
  2. Do I Need Title 24 for a Fire Rebuild?
  3. Do I Need Title 24 for a Guest House?
  4. Do I Need Title 24 for a Pool House?
  5. Do I Need Title 24 for a Prefab Home?

View all Building Permit Questions guides → · Permits and Compliance · Title 24 guide