ADU Electric-Ready Requirements for Gas Appliances

An ADU owes electric-ready work only for the gas or propane appliances it installs. A new detached ADU takes all four provisions, an attached ADU or garage conversion takes only the water heater provision, and a conversion of existing conditioned space takes none. Electric equipment triggers nothing.

  1. Choose your report
  2. Upload your plans
  3. Pay securely
  4. Permit-ready report by email

The trigger is the appliance

Each provision turns on a gas or propane appliance: water heater (Section 150.0(n)1), furnace (t), cooktop (u) or dryer location with gas piping (v). An all-electric ADU owes nothing, and a gas range alone triggers only the cooktop rule. The general rules are on electric-ready requirements.

Which provisions reach which ADU

  • New detached ADU, or a JADU built as part of a newly constructed building: all four, as the Energy Commission's ADU guidance confirms.
  • Attached ADU or garage conversion (an addition): Section 150.2(a) carries Section 150.0(a) to (n), so the water heater provision comes along where the heater is in the added floor area; (t), (u) and (v) do not. The manual disagrees with itself here: chapter 5 matches the Standards, chapter 10 says additions owe nothing, so confirm with the building department.
  • Conversion of existing conditioned space (an alteration): none. A JADU inside an existing house is judged by its scope as an addition or alteration.

What the plans and labels must show

Show each gas appliance's dedicated 240-volt circuit location, at most 3 feet from it, with its cover marked "240V ready" (30 amps for furnace and dryer, 50 for a cooktop). Show the reserved double-pole space in the panel, permanently marked "For Future 240V use". For the water heater, show the heat pump spot and the condensate drain, plus the spare-conductor labelling if the spot is within 3 feet of the heater. The installer records the items on CF2R-ELC-01-E.

What it costs the design

Floor space first: the heat pump spot is 2.5 by 2.5 feet, 6.25 square feet, in a unit where every foot counts. Then circuit planning: four gas appliances mean up to four reserved breaker spaces and four extra circuit runs. A 240-volt, 30 amp dryer plug beside the gas stub-out meets the dryer rule. The rule sets no panel size; see ADU battery-ready requirements for the separate 225-amp busbar question.

Appliance-specific pages: gas water heater and gas furnace. Start on the ADU page or the detached ADU report.

Common Title 24 Questions

  1. Do ADUs need Title 24 in California?
  2. What plans are needed for an ADU Title 24 report?
  3. How much does an ADU Title 24 report cost?
  4. How long does an ADU Title 24 report take?
  5. Does a garage conversion ADU need Title 24?
  6. Does a JADU need a Title 24 report?

Frequently Asked Questions

Explore ADU and JADU

  1. ADU Heat Pump Requirements in California for 2026 Permits
  2. ADU Heat Pump Water Heater Requirements
  3. Does an ADU Need HERS Registration?
  4. ADU Kitchen Range Hood ECC Verification
  5. ADU MERV 13 Filter Requirements

View all ADU and JADU guides → · Permits and Compliance · Title 24 guide

From $199 · ready in 2–3 days

Order Report