How Long Does a Title 24 Report Take?

Our standard turnaround is 2–3 business days from the point we have everything we need, with faster options when a deadline is tight.

Most residential and ADU reports are straightforward once the plans are complete. The clock starts when we have a legible plan set and the project details — not when the order is placed, because a missing floor plan or an unreadable elevation stops the work.

Delivery options

  • Standard — 2–3 business days, included
  • Rush — within 24 hours, $99
  • Priority — 4–6 hours, $199

What slows a project down

The most common delays are avoidable. Plans submitted without dimensions or a scale, window schedules that do not match the elevations, and missing mechanical information all require us to come back to you with questions. Projects where the scope changes mid-review also restart part of the analysis.

What we do when something is missing

We contact you directly rather than guessing. An assumption baked into an energy model is the kind of thing that produces a correction letter at plan check, which costs far more time than the phone call would have. If we spot a genuine problem in the plans — an undersized system, a fenestration ratio that will not comply — we tell you before we build the model.

Commercial projects are scheduled individually. We give you a delivery date with the quote rather than a generic estimate.