Yes. Part 1, Section 10-103(a)1 accepts original signatures on paper or electronic signatures on electronic documents that meet Joint Appendix JA7. Where field verification means the CF1R must be registered, the file you upload should be the registered copy from the ECC-Provider's registry, not a rescan or a retyped version.

  1. Choose your report
  2. Upload your plans
  3. Pay securely
  4. Permit-ready report by email

Both media are written into the code

Section 10-103(a)1 pairs each kind of signature with its medium: an original on a paper document, or an electronic signature on an electronic document that follows JA7. A scan of a wet-signed sheet is neither and the text does not mention it, so ask your department whether its portal takes one. Forms must also be readily legible and in the Commission-approved format.

When the upload has to come from the registry

For low-rise residential projects whose compliance needs field verification, the CF1R is registered with an ECC-Provider, and Section 10-103(a)1A makes both signatures electronic. A certificate built into the plan set must then be a copy of the registered document (Section 10-103(a)2A). In October 2026 CHEERS is the only ECC-Provider the Commission lists as approved; the registration lookup page shows how to find a number.

How a reviewer can trust a PDF

JA7.5.5 makes the current revision held in the registry the reference for authenticity. The registry puts a digital certificate over the entire document, so a recipient can validate an electronic copy automatically, or compare a printout with the registry copy by eye. After a revision, only the latest registered revision is valid for submittal.

What to put in the portal

  • Every page of the CF1R. A registered multi-page document repeats its registration number on each page (JA7.5.2.1).
  • The plan sheet that carries the certificate, if your department wants it incorporated into the drawings, as the plan set page describes.
  • The compliance software input file, only if the department asks for it (Section 10-103(a)2C).

Keep a copy for the final inspection

Installers' and raters' certificates may be posted, kept with the permit, or shown on an approved registry, and the builder leaves copies for the owner in paper or electronic form (Section 10-103(b)1A). If one goes missing later, see how to find a Title 24 report. Portal rules are local, so confirm them before uploading. A compliance letter is not a certificate. For a registered, signed set, start with residential Title 24 reports.

Common Title 24 Questions

  1. What is Title 24?
  2. Do I need a Title 24 report?
  3. How much does a Title 24 report cost?
  4. How long does a Title 24 report take?
  5. What is included in a Title 24 report?
  6. What plans do I need to upload?

Frequently Asked Questions

Explore Permit-Ready Reports

  1. Can Title 24 Be Done From Preliminary Plans?
  2. Title 24 Checklist Before Building Permit Submittal
  3. What Is a Title 24 Compliance Letter?
  4. Title 24 for a Project With No Existing Plans
  5. What Must the Plan Set Show for Title 24?

View all Permit-Ready Reports guides → · Reports and Calculations · Title 24 guide