Title 24 for As-Built Permits in California

An as-built permit is an ordinary application for work already standing, so the Energy Code is checked against the code in force on the application date. The measured record you hand the department decides which compliance route is open and what has to be tested on site.

  1. Choose your report
  2. Upload your plans
  3. Pay securely
  4. Permit-ready report by email

What the as-built set records

Part 6 defines record drawings, which it also calls as-built drawings, as drawings of the as-installed location and performance data for lighting and space conditioning components. That includes duct and pipe layout and sizes, terminal device layout and airflow rates. For the energy model add scaled plans, sections and elevations, with each feature labeled existing, altered or new, as the compliance manual's steps for existing buildings direct.

Choosing the route

Three routes exist. The prescriptive rules for additions or alterations apply component by component. The performance method models existing, altered and new features together. Section 150.2(c) also lets any addition or alteration comply by meeting the requirements for the entire building. Whichever you pick, the department must determine in writing, and a permit stamp counts, that the construction is designed to comply with the Part 6 in force on the application date (Section 10-103(d)1).

What gets tested on work already built

Where the CF1R relies on field-verified features, it is registered and an ECC-Rater tests the installed system as it stands. A duct system that was extended must show leakage of 10 percent of airflow or less, or 7 percent or less to outside, and an entirely new duct system must test at 5 percent or less. Where neither can be met, every accessible leak is sealed and confirmed by a visual inspection and smoke test.

Paperwork that points back at the permit

A certificate of installation must state the permit number under which the work was performed (Section 10-103(a)3B). Work done before any permit existed therefore needs the department's direction on how it will be certified. A house cannot pass final inspection until compliance is verified.

The code edition, the classification of rooms and ADUs, and the evidence for hidden construction are covered on unpermitted work and as-built permits. What each classification triggers is on legalizing unpermitted construction, and the dating rule is on which energy code applies. Test details are in duct leakage testing. Our residential Title 24 reports work from measured drawings.

Common Title 24 Questions

  1. What is Title 24?
  2. Do I need a Title 24 report?
  3. How much does a Title 24 report cost?
  4. How long does a Title 24 report take?
  5. What is included in a Title 24 report?
  6. What plans do I need to upload?

Frequently Asked Questions

Explore Existing Buildings

  1. Title 24 for Legalizing Unpermitted Construction
  2. Unpermitted HVAC or Water Heater Replacement: Getting It Permitted Now
  3. Adding Solar to an Existing Home: Title 24 Rules
  4. Title 24 for Legalizing an Old Garage Conversion
  5. Title 24 for Unpermitted Work and As-Built Permits

View all Existing Buildings guides → · Permits and Compliance · Title 24 guide

From $199 · ready in 2–3 days

Order Report