What Is Quality Insulation Installation (QII)?
QII is a verified standard of insulation workmanship. Under the 2025 code it is required for new homes in all 16 climate zones on the prescriptive path, and it is inspected during construction, before the walls are closed.
- Choose your report
- Upload your plans
- Pay securely
- Permit-ready report by email
Workmanship, not R-value
Ordinary insulation compliance is about the specified R-value. QII is about whether the insulation was actually installed in a way that delivers it — no gaps, no compression, no voids behind wiring or plumbing, proper contact with the air barrier on all sides.
The reason this needs a separate standard is that installed performance and specified performance diverge sharply. Batts stuffed around a pipe or left slumped in a cavity carry a label saying R-15 and behave like considerably less. QII exists because the label is not the performance.
Where it is required
For a new single-family home on the prescriptive path, QII is part of the package in all 16 climate zones. On the performance path, the standard design the house is measured against assumes verified QII, so a design that leaves it out gives up that performance and has to make it up with better equipment, glazing or insulation elsewhere.
Additions over 700 square feet carry the same expectation. Additions of 700 square feet or less are exempt, and where an unconditioned space such as a garage is converted, existing headers do not have to be insulated and air sealing is not required where the existing air barrier stays in place.
The inspection timing is the whole difficulty
QII cannot be verified at the end. Once drywall is up, nobody can see whether insulation is in full contact behind it. Verification therefore happens in stages during construction, before the cavities are closed.
This is the practical consequence people underestimate. QII inserts hold points into the construction programme, and a framing crew that closes up a wall before the rater has seen it has destroyed the evidence. The verification can then not be completed, and a house whose compliance depends on QII no longer complies.
Plan it from the start
Because QII is set in the compliance documents and verified on site, it is the measure most likely to be known to the energy consultant and unknown to the builder. That combination is how a project arrives at final inspection with a requirement it cannot show was met.
If QII is in the calculation, it belongs in the construction programme and in the subcontractor's scope from the start — not discovered at the point somebody asks for the verification.
What to establish
Whether the project needs QII (a new home or an addition over 700 square feet usually does), whether the builder has agreed to the inspection hold points, and who is booking the rater. If the answer to the first is yes and to the others no, that is a risk worth resolving before framing.
Common Title 24 Questions
- When is Title 24 required for a home?
- Does a remodel need Title 24?
- Does a room addition need Title 24?
- What plans are needed for a residential Title 24 report?
- How much does a residential Title 24 report cost?
- How long does a residential Title 24 report take?
Explore Insulation
- Radiant Barrier Requirements Under Title 24
- Raised Floor Insulation Requirements Under Title 24
- Re-Siding a House: Does Title 24 Require Wall Insulation?
- Re-Stuccoing a House: Does Title 24 Require Wall Insulation?
- Recessed Lights Under Attic Insulation: IC-Rated, Airtight or Covered?
View all Insulation guides → · Windows and Building Envelope · Title 24 guide