Remodel With New HVAC and Water Heater: Title 24 Checklist

Both replacements are alterations with their own fuel rules and their own proof. The HVAC half needs duct, airflow and charge checks by an ECC-Rater; the water heater half is checked by the inspector and needs insulated pipes. Plan one permit, one compliance document and two separate sign-offs.

  1. Choose your report
  2. Upload your plans
  3. Pay securely
  4. Permit-ready report by email

Fuel choices come first

A replaced heating system may not use electric resistance as its primary heat (Section 150.2(b)1G), so the usual choices are a heat pump or gas or propane, and electric resistance survives only in the narrow cases of Exceptions 1 to 3. A replaced water heater may be gas or propane, a single heat pump water heater, a NEEA Tier 3 heat pump unit, or a consumer electric unit if the old one was electric resistance (Section 150.2(b)1Hiii). A gas furnace with a gas water heater, or a heat pump with a heat pump water heater, both qualify.

The garage is where the trades collide

An air handler, coil or plenum in a garage carries a duct leakage limit of 6 percent or a smoke test, whatever length of duct is replaced. A heat pump water heater chosen under the single-unit option must sit on an R-10 insulated surface with its tank not outdoors, and unconditioned inlet air calls for backup heat unless the compressor cut-off is below the local winter extreme (Section 110.3(c)7). An indoor heat pump water heater also draws its heat from the indoor air, a load the manual says to consider when sizing heating equipment.

Two proofs, one visit that matters

  • HVAC: duct leakage of 10 percent or less, or 7 percent to outside, or a smoke test; refrigerant charge and 300 cfm per ton airflow for air conditioners in zones 2 and 8 to 15 and heat pumps everywhere; a setback thermostat.
  • Water heater: the alteration rules list no ECC-Rater test. The department checks the heater type and pipe insulation; a certificate for a heater swap is its call.

Paperwork and booking

The manual names CF1R-ALT-02-E for HVAC changeouts, which can be presented at final, and CF1R-ALT-01-E or ALT-05-E for other prescriptive alterations. Ask which combination your department takes. Book the ECC-Rater before the HVAC install, because testing follows installation.

Deeper pages: permit or Energy Code for a swap, water heater requirements, heat pump water heater installation, duct leakage testing and the whole-house checklist.

Common Title 24 Questions

  1. When is Title 24 required for a home?
  2. Does a remodel need Title 24?
  3. Does a room addition need Title 24?
  4. What plans are needed for a residential Title 24 report?
  5. How much does a residential Title 24 report cost?
  6. How long does a residential Title 24 report take?

Frequently Asked Questions

Explore Water Heaters

  1. Title 24 Water Heater Requirements
  2. Water Heater Blanket and Hot Water Pipe Insulation: Title 24 Rules
  3. Do I Need Title 24 for a Water Heater Permit?
  4. Is California Banning Gas Water Heaters? What Title 24 and Air Districts Say
  5. 120-Volt or 240-Volt Heat Pump Water Heater: What Title 24 Allows

View all Water Heaters guides → · HVAC and Water Heating · Title 24 guide

From $199 · ready in 2–3 days

Order Report