Attic Conversion to Living Space: Title 24 Requirements

An attic conversion is an addition, and roof insulation is only half the job. The other half is mechanical: ducts or an air handler left in the attic, the unused attic behind the knee walls, the radiant barrier and the access hatch each carry their own rule. Plan the equipment before the insulation.

  1. Choose your report
  2. Upload your plans
  3. Pay securely
  4. Permit-ready report by email

Where the ducts end up sets the package

Above 700 square feet the manual offers two roof-and-ceiling options (Tables 9-1 and 9-2). Option B keeps the duct system and air handler in the attic. Option C requires them to be in conditioned space and in return asks for no roof deck insulation. At 700 square feet or less the choice does not arise: a ventilated attic takes R-38 or R-30 by zone with a radiant barrier in zones 2 to 15, and an enclosed rafter ceiling follows Section 150.0.

Ducts that stay in unconditioned attic

New or extended ducts there take R-8 in zones 1, 2, 4 and 8 to 16 and R-6 in zones 3 and 5 to 7 (Table 150.2-D). Extending an existing system, by any length, brings the combined duct system under the leakage test: 10 percent of airflow or less, or 7 percent or less to outside. The existing equipment need not meet current efficiency rules, but its heating capacity must satisfy CRC 303.10. A ductless unit avoids all this.

The attic left behind the knee walls

The manual separates two cases. If the attic is an open, undivided space, the entire roof or ceiling is insulated, including portions over unconditioned space such as a garage. If a continuous air barrier divides the attic over the new room from the rest, only the part over conditioned space is insulated, and the manual recommends insulating the barrier too. Doors or hatches into the leftover attic need permanently attached insulation and a gasket (Section 150.0(a)3).

Radiant barrier placement

The manual says a required radiant barrier goes on the underside of the attic roof assembly and the gable wall ends that belong to the addition, nowhere else. Table 9-1 notes it does not apply to cathedral ceilings. The roof-line and knee-wall values are on attic conversion.

For floor and duct questions over a garage see bonus rooms over a garage. Duct values are on duct insulation, and the cellar case is basement conversion. Our residential reports start from your plans.

Common Title 24 Questions

  1. When is Title 24 required for a home?
  2. Does a remodel need Title 24?
  3. Does a room addition need Title 24?
  4. What plans are needed for a residential Title 24 report?
  5. How much does a residential Title 24 report cost?
  6. How long does a residential Title 24 report take?

Frequently Asked Questions

Explore Insulation

  1. Attic Hatch Insulation and Gasket: What Title 24 Requires
  2. Attic Insulation Certificate: What the Contractor Must Give You
  3. Attic Insulation Requirements for California Remodels
  4. Can a Radiant Barrier Replace Attic Insulation Under Title 24?
  5. Cathedral Ceiling Insulation Under the 2025 Energy Code

View all Insulation guides → · Windows and Building Envelope · Title 24 guide

From $199 · ready in 2–3 days

Order Report