How Does a Heat Pump Change a Title 24 Calculation?

The reference house in the calculation has a heat pump. A heat pump at minimum efficiency scores even, while a gas furnace adds heating energy that the rest of the design must offset. Choosing a heat pump also brings controls and tests: supplementary-heat limits, a defrost timer and refrigerant charge verification.

  1. Choose your report
  2. Upload your plans
  3. Pay securely
  4. Permit-ready report by email

The baseline you are measured against

Table 150.1-A allows no electric resistance space heating in any zone and sets the heat pump at minimum HSPF2 and SEER2 in all 16. The compliance manual spells out the consequence: a proposed central gas furnace significantly increases heating source energy compared with that reference, and the gap shows up in the compliance margin. Prescriptively, heating must be a heat pump, so a furnace is only reachable through performance compliance.

Making up a furnace penalty

The deficit has to come from elsewhere in the design: better envelope, quality insulation installation, or a battery paired with solar, which can release a modest efficiency credit. A larger array alone cannot help, because solar does not affect the efficiency score. Credit for a variable-capacity heat pump must be field verified by an ECC-Rater, and so must the heating capacities at 47F and 17F when performance compliance requires a heat pump.

Supplementary heat limits

  • Supplementary electric or gas heat must lock out above 35F outdoor temperature, and may run above that only during defrost or when the user selects emergency operation.
  • Electric resistance capacity may not exceed 2.7 kW per ton of nominal cooling capacity at 95F, rounded up to the closest kW.
  • Homes under 500 square feet, and homes of any size in zones 7 and 15, may use alternative controls.

Defrost and testing

If the unit has an installer-adjustable defrost delay timer it must be set to 90 minutes or more and certified on the CF2R. Zones 6 and 7 are excepted, as are homes of 500 square feet or less in zones 3, 5 through 10 and 15. Refrigerant charge verification applies to heat pumps in all 16 zones, so the ECC-Rater visit is not optional; duct testing is the companion visit.

For an existing home

A swap in an alteration is judged by the altered-component rules, covered in the replacement checklist. For the plain requirements read heat pump requirements, and for detached units whether an ADU can use a gas furnace. Our residential report models the combination for you.

Common Title 24 Questions

  1. When is Title 24 required for a home?
  2. Does a remodel need Title 24?
  3. Does a room addition need Title 24?
  4. What plans are needed for a residential Title 24 report?
  5. How much does a residential Title 24 report cost?
  6. How long does a residential Title 24 report take?

Frequently Asked Questions

Explore Energy Calculations

  1. How Do Duct Location and Leakage Affect Title 24 Calculations?
  2. How Do House Size, Stories and Bedroom Count Affect Title 24 Calculations?
  3. How Does HVAC Efficiency Affect Title 24 Calculations?
  4. How Does Insulation Affect Title 24 Calculations?
  5. How Does Roof Type Affect Title 24 Calculations?

View all Energy Calculations guides → · Reports and Calculations · Title 24 guide

From $199 · ready in 2–3 days

Order Report