Additions, Remodels and Conversions
46 answers in 5 groups, each one question with the code behind it.
- Choose your report
- Upload your plans
- Pay securely
- Permit-ready report by email
Size, scope and what already exists decide how much of the Energy Code applies to a home project. These pages cover additions by size and type, enclosures and conversions, remodel checklists and the questions that come up when existing systems serve new space.
In this section
- Addition size (6)
- Types of additions (6)
- Enclosures and conversions (15)
- Remodel checklists (10)
- Existing systems and compliance method (9)
Addition size
How the square footage of an addition changes the requirements, from small additions to those over 1,000 sq ft.
- Does a Room Addition Need Title 24?
- 300 Sq Ft Addition Title 24 Requirements
- 500 Sq Ft Addition Title 24 Requirements
- 700 Sq Ft Addition Title 24 Requirements
- 1,000 Sq Ft Addition Title 24 Requirements
- Addition Over 1,000 Sq Ft: Title 24 Requirements
Types of additions
Second stories, primary bedrooms, family rooms and kitchen expansions: what each adds to the compliance picture.
- Second-Story Addition Title 24 Requirements
- Does a Sunroom Need Title 24?
- Second-Story Addition: Ducts, Stairwell and Solar Under Title 24
- Primary Bedroom Addition Title 24 Requirements
- Kitchen Expansion Title 24 Requirements
- Family Room Addition Title 24 Requirements
Enclosures and conversions
Turning a sunroom, patio, porch, carport, basement, attic, shed or studio into living space.
- Does an Attic Conversion Need Title 24?
- Does a Basement Conversion Need Title 24?
- Do Shipping Container Homes Need Title 24?
- Sunroom Conversion Title 24 Requirements
- Patio Enclosure Title 24 Requirements
- Porch Enclosure Title 24 Requirements
- Carport Conversion Title 24 Requirements
- Basement Conversion Title 24 Requirements in California
- Attic Conversion to Living Space: Title 24 Requirements
- Bonus Room Over a Garage: Title 24 Requirements
- Shed Conversion to Living Space: Title 24 Requirements
- Detached Studio Conversion to Living Space: Title 24 Requirements
- Pool House Conversion to Living Space: Title 24 Requirements
- Guest House Conversion Title 24 Requirements
- Title 24 for Legalizing an Old Garage Conversion
Remodel checklists
When a kitchen or bathroom remodel triggers Title 24, and what to prepare for remodels that combine windows, HVAC, water heaters and insulation.
- Does a Kitchen Remodel Need Title 24?
- Does a Bathroom Remodel Need Title 24?
- Does a Remodel Need Title 24?
- Whole-House Remodel Title 24 Checklist
- Kitchen Remodel: When Title 24 Is Triggered
- Bathroom Remodel: When Title 24 Is Triggered
- Remodel With New Windows and HVAC: Title 24 Checklist
- Remodel With New HVAC and Water Heater: Title 24 Checklist
- Remodel With New Insulation and Windows: Title 24 Checklist
- Remodel With Roof and Attic Insulation Changes: Title 24 Checklist
Existing systems and compliance method
Whether existing windows, HVAC and water heaters can serve an addition, and how the prescriptive and performance methods compare.
- Does Adding Central Air Need Title 24?
- Prescriptive vs Performance Compliance
- Can Existing Windows Stay During a Home Addition?
- Can Existing HVAC Serve a New Home Addition?
- Can an Existing Water Heater Serve a New Addition?
- Home Addition With a Mini-Split: Title 24 Design Guide
- Home Addition With a Heat Pump Water Heater: Title 24 Guide
- Existing + Addition + Alteration: How the Performance Method Works
- Prescriptive vs Performance Compliance for Home Additions
For the bigger picture, see everything you need to know about Title 24, the requirements overview and all Title 24 questions.
